Barron River Bridge Reopens to Two Lanes with Precautionary Load Limit
Source: Qld
Article: Queensland’s Barron River Bridge partially reopened on Friday the 20th of September following detailed investigations by the Department of Transport and Main Roads (TMR). The bridge now operates with a 42.5 tonne load limit, allowing for two lanes of traffic. Earlier this year in May 2024, inspections discovered unidentified issues with the Macalloy bars […]